I'm giving until the Competition to have things completed then if not done by time the comp then non can be bred. Not sure when I'll do the event though, maybe lil later idk.. Maybe start of next month or so as we're not doing 3 and that be 6 weeks long if kept with that. (event going to slow rather focus on our regular adopts)
I'm not sure yet when going to is what I was saying. I'm prob making it later than what it was scheduled. So that everyone can try and complete as not everyone has